5 hours ago
Ubuntu 24.04.3 LTS, straight install, no docker. I was on 10.10.7, stopped the services, ran a backup, ran the update from the GUI, it said it failed because jellyfin post upgrade returned error exit status 1. I checked the service status and it said it was running. I pulled up the web interface and it showed it had started the migration.
I saw this line in the log: Error creating "Jellyfin.Plugin.Tvdb.Providers.TvdbEpisodeImageProvider", I threw that into a google search and read a couple items. When I went back to the tab I had the migration log pulled up in it was showing bad gateway. Jumped back to the shell and checked the service status and it said it was dead and deactivated. I thought maybe it was doing something in the background so I checked system usage and it was basically idle, barely any processor usage. I decided to see if it would start so I sent the service start command it came up as expected. Checking the logs it looks like it failed partway through the migration, the last thing it showed before I started it again was "Running query planner optimizations in the database... This might take a while". There are a lot of entries that said Migration was successfully applied so maybe it was just a post migration clean up? I've done the scan all library and missing meta data scan on the music library and it seems to be okay.
Just appreciate a quick look and see if there is anything that looks wrong that needs to be addressed.
Thanks.
Log file attached, about 800 lines.
I saw this line in the log: Error creating "Jellyfin.Plugin.Tvdb.Providers.TvdbEpisodeImageProvider", I threw that into a google search and read a couple items. When I went back to the tab I had the migration log pulled up in it was showing bad gateway. Jumped back to the shell and checked the service status and it said it was dead and deactivated. I thought maybe it was doing something in the background so I checked system usage and it was basically idle, barely any processor usage. I decided to see if it would start so I sent the service start command it came up as expected. Checking the logs it looks like it failed partway through the migration, the last thing it showed before I started it again was "Running query planner optimizations in the database... This might take a while". There are a lot of entries that said Migration was successfully applied so maybe it was just a post migration clean up? I've done the scan all library and missing meta data scan on the music library and it seems to be okay.
Just appreciate a quick look and see if there is anything that looks wrong that needs to be addressed.
Thanks.
Log file attached, about 800 lines.

