2024-05-14, 06:15 PM
(This post was last modified: 2024-05-14, 06:16 PM by bitmap. Edited 1 time in total.)
Holy crap I never even looked at this...
I have been running 10.9 for weeks now using the unstable build (just swapped to stable for 10.9.1) and have Trickplay running at 8 AM (bad choice) with a limit of 5 hours. I'm only at 27%. Granted, I have a decent library, but I'd say at this rate it's likely that the process probably will take several days...
EDIT: At 27%, my config folder has ballooned to 54 GB...
I have been running 10.9 for weeks now using the unstable build (just swapped to stable for 10.9.1) and have Trickplay running at 8 AM (bad choice) with a limit of 5 hours. I'm only at 27%. Granted, I have a decent library, but I'd say at this rate it's likely that the process probably will take several days...
EDIT: At 27%, my config folder has ballooned to 54 GB...
Jellyfin 10.10.0 LSIO Docker | Ubuntu 24.04 LTS | i7-13700K | Arc A380 6 GB | 64 GB RAM | 79 TB Storage