2025-03-16, 01:54 PM
Quote:My native language is not English, and all texts are translated through AI, so there may be errors. I apologize in advance for any inaccuracies.
In Scheduled Task, there is a "time limit (hours)" setting. How does it work? (Or, what is its function?)
Does it mean that when "time" expires, the task is executed, and then it needs to wait for the duration set in "time limit (hours)" before restarting the calculation of "time"?
Or, when the "time" expires, both the "time" and the "time limit (hours)" start to be calculated simultaneously, and the task will only be executed if both exceed their time limits?
Or is it used only to set an interval time to prevent frequent execution, where the Scheduled Task will only execute if the interval between two times is greater than the "time limit (hours)"?